Liaoning Metallurgy&Mining Heavy Machinery Co.,Ltd.

Address: No. 29, No. twenty-six East Road, Economic and Technology 
Development Zone, Shenyang
Tel:024-25175347
Fax:024-25175347
Sales Department:18540028958
http://www.machindust.com/
http://www.lyzxjx.cn/
E-mail:info@machindust.com

Copyright  Liaoning Metallurgical Heavy Machinery Co., Ltd. All rights reserved                         Powered by:300.cn Shenyang    辽ICP备10207322号

>
>
The installation of crusher

The installation of crusher

Page view

Machine maintenance

1. The shaft of the bearing crusher bears the full load of the negative machine, so good lubrication has a great relationship with the bearing life. It directly affects the service life and operation rate of the machine. Therefore, the injected lubricant must be clean and the seal must be good. , the main oil filling of this machine:

(1) Rotary bearing (2) Roller bearing (3) All gears (4) Active bearing

2. The newly installed tires are prone to loosening and must be inspected frequently. 

Test drive

1. The equipment should be installed on a horizontal concrete foundation and fixed with anchor bolts.

2, the installation should pay attention to the main body and the horizontal vertical

3. Configure the power cord and control switch according to the power of the device.

4. Check whether the bolts in all parts are loose and the mainframe door is tight after installation.