Liaoning Metallurgy&Mining Heavy Machinery Co.,Ltd.

Address: No. 29, No. twenty-six East Road, Economic and Technology 
Development Zone, Shenyang
Tel:024-25175347
Fax:024-25175347
Sales Department:18540028958
http://www.machindust.com/
http://www.lyzxjx.cn/
E-mail:info@machindust.com

Copyright  Liaoning Metallurgical Heavy Machinery Co., Ltd. All rights reserved                         Powered by:300.cn Shenyang    辽ICP备10207322号

>
>
General requirements for installation of crushers

General requirements for installation of crushers

Page view

1. The driver of the transfer machine and the crusher must be trained to achieve “three understandings” (understand the structure, understand the performance, understand the principle), “four sessions” (will use, will maintain, will maintain, will handle the fault), after the training test Qualified, after obtaining the certificate of conformity, the party is allowed to take up the post.

2. Cooperate closely with the driver of the working face scraper and the driver of the conveyor belt conveyor, unify the signal connection, and open and stop in sequence. When large coal and slag accumulate in the feed port of the crusher, the operation of the working and surface scraper conveyor should be stopped. If large pieces of coal are not allowed to enter the breaker or have metal objects.